Fujian Xinsen Synthetic Fiber Technology Co., Ltd.

Project site: Chengnanyuan Economic Development Zone, Youxi County, Sanming, Fujian
The project covers a total area of 2,000 mu, with a planned total investment of CNY5.8 billion and a total floor area of more than 1.4 million square meters. The construction period of the project is five years, and it is planned to be invested in three phases, including 700 mu of land in phase I. After all the phases are completed, it will become a large-scale textile enterprise integrating "polymerization of nylon, warp knitting, lace fabric, printing and dyeing, and processing of high-grade fabrics".
We undertook the supply of HV and LV switchgear for Xinsen Synthetic Fiber Phase I Project and the general contracting service of design, construction and power transmission of permanent power utilization project. The project consists of an external line, a main distribution room, two sub-distribution rooms and a group of generators, with a power consumption of 8450 kVA. The project was completed and delivered to the owner on August 30, 2014.