Xinta Shuishang one meter for each household

Project site: Guanyinshan, Xiamen
Xinta Shuishang Project was invested and started by Xinta Group on October 1, 2009. Now it has been built into a high-end building with a total construction area of 228,000 square meters, which is surrounded by nine super-high-rise residential buildings of nearly 150 m.
The project has two power distribution stations, which are powered by four circuits of 10 kV incoming lines at the same time, ensuring extremely high reliability and stability. The total capacity of transformers is 9000 kVA. We were in charge of the design, test and supervision of power engineering and the supply of HV and LV distribution cabinets and distribution automation equipment, and delivered the project for power transmission on May 27, 2014.