Xiamen Chang Gung Hospital Integrated Energy Project

Release date:2021-07-14 16:27:13 View:1424
Xiamen Chang Gung Hospital Integrated Energy Project

Project site: Haicang, Xiamen

Xiamen Chang Gung Hospital Integrated Energy Project includes two phases, and PV power stations are built in the outpatient building, corridor, bus yard, water pool and parking lot (shed is built in the parking lot, and PV panels are installed atop the roof) of Phase I. The total installed capacity is 2.7 MW, 305 Wp per module. The modules are installed at an inclination angle of 5°. The PV power station mainly serves to provide supplementary power for the dormitory, outpatient building and expert building, with the surplus electricity fed to the grid. The charging piles are located in the parking area in front of the outpatient building, which is divided into car charging area and truck charging area: 55 double-gun DC charging piles with a power of 120 kW in the car charging area, and 14 double-gun DC charging piles with a power of 160 kW in the truck charging area, and a swapping station is established in cooperation with BAIC Group. We undertake the construction and power transmission services of the project, which includes the procurement and construction of LV power supply lines and HV and LV distribution equipment, and are responsible for the integrated energy operation and maintenance of subsequent projects.